01 — Select Equipment CategoryThermic Fluid HeatersHeat ExchangersDust Collection SystemsIndustrial Fans & BlowersExplosion VentingAutomation & ControlsCentrifuge & DecantersTechnical Specifications — TFHRequired Duty (BTU/hr)Supply Temperature (°F)Return Temperature (°F)Thermal Fluid TypeMineral-basedSyntheticNot sure / need recommendationFuel PreferenceNatural GasPropaneElectricDual FuelFootprint ConstraintsControls PreferenceBasic local panelPLC / SCADA integrationNot sureTechnical Specifications — HEXDuty (BTU/hr or kW)Preferred TypeShell & TubePlateSpiralNot sureFouling RiskLowModerateHigh / heavy foulingMax Operating Pressure (PSI)Max Operating Temperature (°F)Allowable ΔP (PSI)Cleaning AccessCIP onlyManual access requiredEitherTechnical Specifications — IDCAirflow (CFM)Dust / Material TypeCombustible Dust?Yes — NFPA 652 appliesNoUnknown — need auditPreferred SystemBaghouseCartridge CollectorNot sureExplosion Venting Needed?YesNoUnsureTechnical Specifications — IFBAirflow (CFM)Static Pressure (in. W.C.)Airstream Temperature (°F)MaterialCarbon SteelStainless 304Stainless 316AluminumFRP / FiberglassMotor / DriveDirect DriveBelt DriveVFD-readyTechnical Specifications — EVSEnclosure Volume (ft³)Dust Kst Value (if known)Max Pressure Pmax (if known)Vent Location ConstraintsPreferred ApproachVentingChemical SuppressionIsolationNot sureTechnical Specifications — APVProcess to AutomateExisting PLC / HMI PlatformVFD Integration Needed?YesNoUnsurePredictive Maintenance / AI Monitoring?InterestedNot neededTechnical Specifications — CDMApplicationDrilling MudSlop OilWastewaterOtherThroughput (GPM)New or Reconditioned?NewCertified ReconditionedEitherTarget Brand02 — Project DetailsIndustry Oil & GasPetrochemicalPharmaceuticalFood & BeverageDairyFoundriesGlass MakingWoodworkingSemiconductorsAutomotive & BatteryOtherFacility LocationTarget Timeline Immediate / emergency replacement1–3 months3–6 months6+ months / planning stageProject Scope New installationReplacement / retrofitExpansion of existing systemRepair / troubleshootingCompliance & Codes Applicable ASMEAPITEMANFPA 652OSHANot sure / advise usDrawings, Specs, or P&IDs (optional) 03 — Contact InformationCompanyContact NameEmailPhoneAdditional Notes